Energy

Rubber lining for the MCW circulation piping system of Matarbari Power Plant – Bangladesh

Project

Matarbari Power Plant - Bangladesh

Industry

Energy

Project Duration

40 days

Status

Complete - Export

Customer

Viet Han Engineering (VHE)

Project Introduction

Ha Thanh Industrial Co., Ltd. is honored to carry out the rubber lining project using Ohji Soft Rubber R-16 3.3mm for the MCW circulation piping system of the Matarbari Ultra Super Critical Coal-Fired Power Plant. This is a key project that requires high technical standards to ensure safety, durability, and corrosion resistance in a harsh industrial environment.

Scope & Construction Details

  • Work item: Direct vulcanization rubber lining with OHJI Soft Rubber R-16 3.3mm on-site.
  • Total construction area: 767 m².
  • Implementation area: MCW circulation piping system.
  • Location: Hai Phong.
  • Execution time: Expected completion within 45 days.

Outstanding Value of Rubber Lining Solution

  • Superior corrosion resistance: OHJI R-16 3.3mm rubber resists inorganic chemicals such as HCl, dilute H₂SO₄, NaOH…
  • Increased equipment durability: Minimizes metal corrosion, extends the service life of piping systems.
  • Operational safety assurance: Stable under high temperature and high pressure conditions.
  • Economic efficiency: Reduces long-term maintenance and replacement costs.

Commitment from Ha Thanh

  • With many years of experience in industrial rubber lining for tanks, treatment basins, and piping systems, Ha Thanh commits to:
  • Genuine materials meeting international standards.
  • Strict construction procedures ensuring quality.
  • On-time delivery, meeting stringent technical requirements.